Fixed
Rubbish along main road
Reported via mobile in the Street cleaning and litter category anonymously at 18:32, Tue 20 September 2022 using FixMyStreet Pro
Sent to London Borough of Bexley less than a minute later. FixMyStreet ref: 3836976.
I am disgusted that the path ways are strewn with rubbish .. it appears that the paths are not cleaned or swept .. main road is a disgrace .. the high street is also disgusting .. why is there not more bins knowing that there are so many food outlets .. if the people can’t find a bin they throw on the floor .. maybe the restaurants should be held accountable .. if not then the council should clean more often .. so much money had been spent on the pathways but cars and bikes park on these lovely new pathing slabs which is causing them to be spoilt with oil .. I have seen the road swept occasionally but because of parked cars they just go round them .. then the rubbish is blown on to the path .. could u please look into this please . Thank u
Updates
-
This case is currently being investigated.
Further updates will follow.
State changed to: Investigating
Posted by London Borough of Bexley at 08:53, Wed 21 September 2022
-
The reported issue requires further evidence or investigation, and as such will be monitored by our Highways Technicians.
A re-inspection has been scheduled for a future date, which will determine if any action will be undertaken.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 11:29, Thu 22 September 2022
-
I have seen a sweeper outside the shops in the high street but no one has swept the path ways further along main road .. the rubbish is collecting along the walls .. it’s really not good .. I really think there should be signs put up outside the pub, cafes and restaurants that there is “no parking allowed” maybe more traffic wardens are needed .. the delivery men all park their bikes and some cars on the paths .. these are spoiling the path ways ..
Posted anonymously at 19:44, Tue 18 October 2022
Still open, via questionnaire -
This case is currently being investigated.
Further updates will follow.
State changed to: Investigating
Posted by London Borough of Bexley at 07:40, Wed 19 October 2022
-
This case has been referred to the Council’s contractor to resolve the matter (estimated time between 10 and 15 working days).
We will update the case once it has been completed.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 13:03, Tue 1 November 2022
-
The pathways need sweeping .. rubbish and leaves make it slippery when wet !!
Posted anonymously at 20:10, Tue 15 November 2022
Still open, via questionnaire -
This case is currently being investigated.
Further updates will follow.
State changed to: Investigating
Posted by London Borough of Bexley at 08:20, Wed 16 November 2022
-
The reported issue requires further evidence or investigation, and as such will be monitored by our Highways Technicians.
A re-inspection has been scheduled for a future date, which will determine if any action will be undertaken.
Thank you for reporting this matter.
State changed to: Action scheduled
Posted by London Borough of Bexley at 16:48, Wed 16 November 2022
-
The case has been resolved.
Thank you for reporting this matter.
State changed to: Fixed
Posted by London Borough of Bexley at 15:10, Mon 9 January 2023